Infrastructure Construction
# Project Name Owner Description
1 Bulk Liquid Tank Farm, CAP. 1,000 m3. dia. 13.2 m, H 7.3 m PT Redeco Petrolin Utama Detail design, Supply, Fabrication, Construction and Testing to the Bulk Liquid Storage Tank farm. 
2 Ware House CV. Indochemical Warehouse Construction 
3 Ware House PT Sinar Bintang Semesta Warehouse Construction
4 Construction of Road and Drainage  PT Panadia Indah Dirgantara Construction of Road and Drainage
5 Ms. Storage Tank cap. 750 m3  PT Redeco Petrolin Utama Design & Engineering, Supply, Fabrication, Construction, Testing & Commisioning, Maintenance 
6 Bulk Liquid Chemical Terminal Tank  PT Tomindomas The Construction of Bulk Liquid Chemical Terminal Tank
7 Teluk Bayur Coal Handling Terminal  PT Tambang Batubara Teluk Bayur Coal Handling Terminal. The works covering : Site Preparation, civil works and building Construction 
8 Cigarette Paper Mill  PT Bukit Muria Jaya Earth works, including Cut and Fill drainage and access road for the cigarette paper mill 
9 G-97 (Witel)Project Perumtel
10 Cut & Fill Work PT Indoterminal Citra Cut & Fill Work